THE GIBIDI ELECTRIC GATE AUTOMATION SPECIALIST

We replace broken non working motors also install on existing gates or completely new installations

2019 The Year For GIBIDI Automation 

Office 01773 719347 Sales from 9 to 5 Adrian 07971 475781 

All Post To Mainland UK included in the price Ring Or Email For Price For Other Locations If you are in the uk the price you see is all you pay as we don't add shipping at checkout.... 

If you need product support You will be asked for invoice no and serial no 

so have them ready if you need support!

Unlike other hydraulic underground motors the oil is for the life of the Gibidi Floor underground motors and you don't have to change or top up the oil every 2 - 4 years! Like you DO with SEA & BFT hydraulic underground motors

No Such thing as a direct replacement for a Gibidi Floor motor That isn't Gibidi!



Don't know the parts you need text, email or whatsapp a picture to Adrian on 07971475781 or email mail@arsparks.co.uk with a picture of the broken part or a picture from the back of your gates with a description of the problem and we will do what we can to help

.


Yes we do have new stock in !!!

The new range has been designed with the aim of further improvements over the already high quality of previous models. Here you are the main improvements:

• Increased the size of the internal rack
• Double protection inserted around the transmission shaft
• New bronze guide ring for the transmission shaft
• Increased bearing robustness
• Inserted a thrust bearing on the transmission shaft
• New anchor system for the gearbox bushing
• New anchor system for the hydraulic power unit and the jack for greater resistance.

Here you can see the square shaped rack with guiding system into the gearbody

Old rack at the top new rack at the bottom

On the left new stronger rack, thooth work 100% of their surface on the shaft. On the right, the FLOOR830 rack, it start from a commercial metal bar, thooth works on a 30% shaft surface only, more stress for the sharft thooths

From the back of the operator you can see the ball bearing support in the bottom ( partially visible) plus new thrust bearing support

3 of the main new elements, new RACK

Here you can see the matching of the rack and the shaft. Above the new bushing with bronze guiding ring and double sealing

Below the metal plate there are now 2 pins that made the jack to move together with the hydraulic unit when external forces are pushing on the gate

BELOW IS A WORN TOP BOSS

ABOVE TOP BOSS WORN 

AND BELOW BRONZE BEARING WORN DOWN

 IVE LIFTED THE TOP BOSS SO YOU CAN SEE THE BEARING 

BELOW FOUNDATION BOX WITH MOTOR REMOVED AND ALL MARKED UP READY FOR GRINDING BETWEEN MARKS

Old 810 to new 830 replacement this is how to do it

1, Turn slot so its facing front

2, Remove 2 19mm nuts and slide motor out

3, Mark on back of the 810 foundation box where the 2 straps touch

4, with grinder cut out a bit of the foundation box to let the motor sit in the foundation box

5,  Cut just the right amount as you can see its not much..........

6, replace motor with the bottom boss in the correct place {the motor can do 180 deg so put the bottom boss in correct place for the gates to hit stops open and close.... replace 19mm bolts , wire as before, turn power off for 10 seconds then back on , give gates a command the gates should open,   {if they close swap lives over brown and black}

A90 FLOOR.pdf
FLOOR 824.pdf
FLOOR 830.pdf
FLOOR812_rev02.pdf